尊敬的客戶,您好!
感謝廣大客戶對我司工作的信任和支持!
為了更好地為您提供服務(wù),我司計(jì)劃于9月20日00:00開始對佛山單線電信機(jī)房服務(wù)器網(wǎng)絡(luò)進(jìn)行升級(jí),部分服務(wù)器的網(wǎng)絡(luò)會(huì)出現(xiàn)30-60分鐘的暫時(shí)中斷,我司將盡快恢復(fù)網(wǎng)絡(luò)。
受影響的虛機(jī)業(yè)務(wù)服務(wù)器:
124.172.128.2-131.254
124.172.132.2-135.254
124.172.156.74
124.172.156.173-175
124.172.156.44-45
124.172.156.141
124.172.156.42-43/156.2-6/156.65
124.172.146.2-147.254
124.172.158.2-151.254
124.172.156.17-28/156.49/156.68-69
124.172.156.60-62
124.172.156.139-140
124.172.156.201-205/156.207
124.172.156.46-47/156.12-16/156.67
124.172.156.75/156.58-59
124.172.156.37-38/156.63
124.172.156.131/156.134
124.172.156.220-229
124.172.152.2-155.254
124.172.156.176-180
124.172.156.50-57/156.73/156.82-85
124.172.156.39-41/156.64
124.172.156.190-191
124.172.156.132-133
抱歉給您帶來不便。
順祝商祺!